or call us on 0800 HIREPOOL (0800 4473 7665)
See all branch locations
We have various calculators to help you choose the right generator or pump for your job!
Hirepool Energy has a large range of pumps ranging from 100mm to 150mm.
The New Lynn Rail Trench is the largest railway project in NZ in recent times and is part of Kiwi Rail’s $600million Project DART (Developing Auckland’s Rail....
06 May 2011
Hirepool was involved from the very start of the Manukau Harbour Crossing project as one of the key suppliers of rental equipment to the Manukau Harbour Crossing Alliance.
The Victoria Park Tunnel project aims to increase the safety and improve the traffic flow along the motorway through Auckland’s CBD and the Harbour Bridge.
The New Lynn Rail Trench is the largest railway project in NZ in recent times and is part of Kiwi Rail’s $600million Project DART (Developing Auckland’s Rail Transport). It is being....